MOHAI

MOHAI (Museum of History & Industry)

The project consisted of disconnecting and removing existing equipment and refurbishing the entire building with all new equipment, fixtures, plumbing, HVAC piping, and ductwork. New equipment included energy lab rooftop air-handling units, boilers, multi-stack chillers (five each), chilled water and heating water pumps, heat pumps, humidifiers, fan coil units, exhaust fans, and chilled-water ceiling panels. 3D CAD drawings were used for coordination between all trades.

wirkung levitra free cv writing service uk order neurontine overnight https://www.dimensionsdance.org/pack/4014-buy-real-viagra.html book quotes math sample problems essays help research paper writer jobs http://admissions.iuhs.edu/?page_id=have-viagra criminology essay movei reviews online us pharmacies generic viagra softtabs concept essay ideas como se utiliza o viagra viagra generic alternatives source url go to link literary analysis of i felt a funeral in my brain creative writing picture prompts ks2 http://www.conn29th.org/university/how-can-i-write-essays-better.htm increased libido from viagra follow url dissertation dedication thesis skins https://nyusternldp.blogs.stern.nyu.edu/how-to-retrieve-sent-email-on-ipad/ go to link https://greenechamber.org/blog/how-to-write-great-advertising-copy/74/ rimadyl cialis and highy blood pressure immigration research paper answers to all toefl essays pdf grandfather essay Facts:

  • General Contractor: Sellen Construction
  • Plumbing
  • HVAC
  • Renovation