Auburn Mechanical completed the build-out of two catheterization lab spaces, totaling 2,200 square feet, within a fully occupied medical facility at UW Medical Center. Throughout construction, the remaining cath labs remained 100% operational, requiring careful coordination to minimize disruptions to patient care. Auburn’s full mechanical scope included the installation of medical gas systems, ensuring a seamless, high-performance environment to support life-saving cardiovascular procedures.