Auburn Mechanical successfully completed full mechanical renovations for the Confidential Client’s three-building Pebble Beach campus, totaling 338,000 square feet, in just six months.
Key project highlights included:
Installation of chilled water rooftop AHUs with VAV and electric reheat, optimizing climate control and efficiency
Chilled water fan coils for IT and 24/7 critical loads, ensuring continuous system reliability
Complete replacement of the hydronic piping system, enhancing performance and long-term sustainability
Auburn’s ability to execute large-scale renovations on an accelerated timeline helped deliver a high-efficiency, future-ready mechanical system to support the client’s evolving campus needs.