The Moore Center project provided the Auburn team with some challenges as the original building was permitted for office space and the project required a residential treatment facility. For the space to meet the new requirements of occupancy, the fire and smoke systems were completely redesigned by the Auburn engineering team and installed within a short amount of time to meet a very aggressive schedule. Auburn’s CAD department used their state-of-the-art 3D scanner to get an accurate model for the existing building. The Auburn team faced some permitting challenges, but despite these issues, Auburn was able to complete this complex, fast-paced, full-mechanical project on schedule.

Facts:

  • General Contractor: Anderson Construction
  • Design-Assist
  • Plumbing
  • HVAC
  • Addition