Westland Distillery’s New Process Cooling System Increases Efficiency by 80%

Westland Distillery’s New Process Cooling System Increases Efficiency by 80%

Along with construction services, Auburn Mechanical provided in-house engineering, led by Engineering Manager Randy Stabnow. “We were able to give the customer an engineered system that provides a more consistent water temperature for their processes to ensure a consistent product at a price point that was within their budget,” said Randy. “In addition to the performance of the system, we were able to save hundreds of thousands of gallons of water usage per year.”